Topic Detail
 

Savage River Trail pre-ride
 
The pre-ride of the new trail system at Savage River State Forest was held May 31st. Linas, Jeff, and Chris attended and did the inaugural ride, along with MDOHVA President Ken Kyler and a couple other riders. The 16.5 mile technical loop was great. Weather conditions were perfect. Several DNR officials were in attendance.
 
Created By: Chris Borger  05/31/2017   Archive: 06/30/2018